Lot grading in Modesto and the Central Valley

Cut, fill and compaction that set the finished grade of a yard, a lot or a building pad, and regrading so the ground falls away from the walls, on warehouse yards, retail pads, apartment commons and homes across 32 cities, built to the owner's approved plans.

Pad and lot grade · Sample
Building pad, yard and finished grade1acredisturbance that brings stormwater coverage
StripVegetation and topsoil
FillNo organics, no oversize rock
LiftsCompacted as placed
Across the lineNo more than before

Why the finished grade decides the rest

Ground is shaped once and then lived with for decades. Paving, walks, landscape and the building itself follow the surface they were built on, so a grade that sends water the wrong way is paid for again every wet season. The California Building Code puts the rule at the wall: ground beside a foundation falls away at not less than 5 percent for the first 10 feet, or 2 percent where climate or soil conditions warrant the exception (CBC 1804.4), and where an obstruction or a lot line takes the room away, a swale sloped at least 2 percent inside those 10 feet stands in for it.

Fill behaves the way it was placed. Vegetation, topsoil and other unsuitable material come off first and the surface is scarified, organic matter and oversize rock stay out of the fill, and the material goes down in lifts, each compacted before the next to the density the owner's geotechnical report sets. Backfill at a foundation allows for later settlement, because a pad that settles takes the slab above it down too.

Earthwork at scale brings duties before a machine is unloaded. A grading permit comes from the building official unless the work is exempt, and the application states the quantities of cut and fill with a plan showing existing and finished contours. Disturb an acre, or an acre as part of a larger common plan, and the state construction stormwater programme asks for coverage, which the owner arranges with the pollution prevention plan before the start.

Grading is judged at the property line as well as at the building. Where a city has adopted the grading appendix, drainage across a boundary after the work may be no greater than before, excess or concentrated flow is kept on site or taken to an approved facility, and the ground at the discharge is protected against erosion. A regrade is therefore set out from the outlet backwards, not from the puddle outwards.

What lot grading includes

1
Survey and set out

Existing levels are taken across the lot and at the walls, and the finished grade is drawn against the owner's approved plans: what comes off, what is brought in, where the falls run and which outlet each reaches. The quantities of cut and fill come out of that.

2
Utilities and services

The dig area is delineated, the notification goes in, and the machine waits for every operator to mark its line or answer that it has none. Irrigation, site lighting and fuel lines are found the same way.

3
Strip and cut

Vegetation, topsoil and soft material are stripped and hauled away, the exposed surface is scarified, and the cut is taken down to the level the plan sets.

4
Place and compact fill

Imported or reused material is spread in lifts and compacted as it goes, each one tested to the density the report calls for before the next is placed. Dust is watered down through the work.

5
Finish grade

The surface is trimmed to the falls: away from every wall, along the swales and into the inlets, with no flat corner left holding water.

6
Stabilise and verify

Levels are re-shot against the plan, bare slopes are protected before the final inspection, and the grades, quantities and photographs go into the owner's record.

The rule

Fill is only as good as the lift below it. Material placed too thick, too wet or over ground that was never stripped will settle, and the slab, the paving and the falls built on top of it settle with it.

Where lot grading is needed

Warehouse yards

Tilt-up sites where trailers track the surface out of shape and the yard drains to a handful of inlets that sit high once the ground around them moves.

Retail pads

Pads cut for a new building or an expansion, where the grade has to serve the walks, the stalls and the entry doors as one surface.

Apartment and HOA commons

Lawns, courtyards and planted beds that have been built up over the years until the ground beside the buildings runs the wrong way.

Older low-lying housing

Streets laid before modern drainage, where finished floors sit close to or below the kerb and the ground beside the wall carries the water.

Unincorporated pockets

Properties on the agricultural edge with open ditches and no storm system, where the low spot in the yard is the only place rain collects.

Yards before paving

Subgrade brought to line and level, compacted and handed over so the base and the surface above it are laid on ground that will not move.

Questions about lot grading

Usually, and the building official decides. A grading permit is the normal route for earthwork, with exemptions for small self-contained work that does not endanger the public or affect adjoining property, and for excavation belonging to a building permit already issued. Whether the grading appendix applies at all depends on the ordinance that city or county has adopted.

Lot grading by city

Lot grading is requested through the grading and drainage page for your city, which covers the ground, the permit office and where the water goes there.

All 32 cities →

Related grading and drainage services

Request

Lot grading in any of 32 cities

Start the request and a licensed crew is assigned to it. Site visit scheduled at a time that suits you. Start date set in the written estimate. Water inside the building: that is water damage restoration and its emergency line.

Start a request
3xrank
Propertyvendr is owned, built and managed by 3xrank
Visit 3xrank.co →