Propertyvendr
Client login
Ripon, San Joaquin County · 11 miles from the Modesto base · Planned work, scheduled with the property

Asphalt paving in Ripon, CA

Asphalt paving for the truck and travel plazas at Jack Tone Road, the industrial yards on South Stockton Avenue, the Main Street shop lots and the school and park grounds. Repair and digouts, resurfacing, crack treatment, seal, layout and the accessible stall set, from a marked plan.

DispatchEn route
Modesto base → Jack Tone Road
Parking lot · surveySite visit booked
Pavement conditionRated on site
FailedBelow 25
Poor25 to 49
Fair50 to 69
GoodAbove 70
PCI: 0 worst, 100 best

Why asphalt paving is needed in Ripon

Ripon's highway service corridor was built for trucks, and trucks are hardest on a surface. The City records two major auto and truck travel plazas, with fast-food restaurants and motels added at the Jack Tone Road interchange, which it describes as designed to serve large volumes of traffic and especially trucks, on a stretch of State Route 99 carrying about 139,000 vehicles a day. Caltrans' overlay guidance rules open-graded surfaces out of severe turning areas and fuel or oil spill areas for this reason.

The freeway and the railroad cut the city, so traffic funnels through three points. North-south movement crosses on Main Street, Fulton Avenue with northbound access only, and the Jack Tone Road interchange, and State Route 99 itself carries 114,000 vehicles a day at Main Street. Lots near those crossings take concentrated turning traffic, and they are also the lots where a closure is hardest to detour around, so the phasing plan is settled before any date is agreed.

A two-hour downpour has already found Ripon's low points and named them. A storm beginning at 5 p.m. dropped two and a half inches in two hours, popped manhole covers and left cars stalled with water halfway up their doors; the spots reported were Acacia and Milgeo avenues, Canal Street east of Jack Tone Road, Doak Boulevard, Avenue A near Ripona School and Wilma Avenue at Fourth Street. Caltrans' crack guidance traces that water straight into the base.

Water leaves a Ripon lot four different ways, and only one of them is a public storm sewer. Runoff from the older industrial area west of the freeway goes into industrial sewer lines, part of the city is pumped into SSJID lines and canals, the largest share runs by gravity through seven outfalls into the Stanislaus River, and the Jack Tone commercial area drains to a detention pond. The normals put almost all of that water into the winter half.

Older commercial blocks are where a restripe changes more than the paint. A 2009 survey of a portion of Ripon's older areas found 374 of 644 parcels showing signs of structural dilapidation or deterioration, and lots of that age were usually laid out before the current accessible parking dimensions. The ADA.gov restriping brief brings those spaces into the job, counted for each parking facility on the site.

Ripon fact

About 31 percent of Ripon's homes, 1,577 of them, were built between 2000 and 2009, the city's busiest decade, and the median year built is 1990. Lots laid with that generation of housing are now at the age when a first seal is worth more than a later rebuild.

Asphalt paving, as delivered in Ripon

Ripon is 11 road miles north of the Modesto base on Highway 99, over the Stanislaus River. The marked lot plan from the first visit is what every later measurement and photograph is added to.

1
Request and site visit

The request arrives with the service and the city filled in, and a site visit is arranged with the paving contractor assigned to it. The lot is walked with the owner or manager, noting how vehicles reach it, where trucks turn and the hours it is busiest. Site visit scheduled at a time that suits you. Start date set in the written estimate.

2
Condition survey

Each distress goes on the plan by type: alligator, longitudinal, transverse and block cracking, potholes, raveling and oil spots, with the low spots that hold water and whichever of the city's four drainage routes the lot uses. Accessible stalls and aisles are measured against Chapter 11B and the surface is rated on site.

3
Treatment and code path

One treatment follows: crack treatment and seal, repair and seal, grind and overlay, or reconstruction. Permits go through the City of Ripon Building Department at 259 North Wilma Avenue, with heavy commercial plans sent out for review.

4
Written estimate

Line items by area and length, repair kept apart from the surface work, and the basis of the figure stated in the estimate.

5
Scheduled around tenants and weather

A travel plaza never really closes and a food plant runs to season, so the lot is phased in sections with one route in and one out open throughout. Irrigation is off five business days before a seal, accessible stalls go back first, and nothing is placed with rain forecast during curing.

6
Work and material handling

Saw cuts two inches to a true line, digouts tack coated and filled with hot mix, cracks treated and cured, oil spots primed and drain inlets covered.

7
Handover

Handover is the marked plan, the stall and aisle measurements against Chapter 11B, before and after photographs of each area, the product data sheets for what was placed and the warranty terms.

Where asphalt paving is needed in Ripon

Ripon's paving runs from a brick main street to freeway truck plazas, a river-side industrial district and 2000s tracts.

Downtown Main Street

The historic commercial core, with the two-story Riddle and Odd Fellows buildings, the Bank of Ripon at Main and Stockton and the Markham Hotel. Parking here is small rear lots and kerbside bays, and the alley approaches take the delivery traffic the street cannot.

The 1910s and 1920s streets south of Main

Stockton, Walnut, Locust, Elm, Orange, Palm and Acacia streets, largely bungalows with some Mission and Classical Revival types, and Queen Anne and Italianate cottages near the depot. Driveways and shared courts here date from before kerb and gutter were standard.

The South Stockton Avenue industrial district

A planning district of 533 acres including 237 designated Heavy Industry, holding most of the city's industrial uses, among them a pet food plant on a site bounded by the freeway and the river. Plant yards here carry loaded trucks on sections that fail at the wheel paths.

The former paper mill site by the river

Where a mill opened in 1965, passed through two owners and closed permanently in 2009 after producing about 35,000 tons of paper a year. Large legacy industrial pavement of that age is usually beyond sealing and is dealt with by reconstruction in sections.

The Stanislaus River corridor and the Vera district

The river is the city's southern boundary and its only FEMA 100-year flood zone, with treatment ponds in the south of the district behind levees. Access roads and yards near a levee are surveyed for base loss after any period of high water.

Jack Tone Road and the highway service corridor

Two major auto and truck travel plazas, with fast-food restaurants and motels, on a stretch of freeway carrying about 139,000 vehicles a day, draining to a detention pond. Fuel islands and truck parking concentrate standing loads and spillage in one part of each lot.

The North Pointe plan area

310 acres bounded by Mistlin Sports Park, Fulton Avenue, the freeway frontage road and Jack Tone Road, holding orchards, food processing plants, trucking yards, a light industrial park and highway commercial. An 800-foot at-grade concrete SSJID canal section runs along Fulton Avenue.

The Ripona planning district

146 acres including 42 designated Urban Core, with the properties south of Milgeo Road built out. In the October downpour two vehicles were stranded at Acacia and Milgeo avenues and flood water closed off Avenue A near Ripona School.

Wilma Avenue and the North Wilma district

270 acres north of West Main Street, including a 53-acre high school site, a 20-acre elementary site and 19 acres of community commercial, with City Hall at 259 North Wilma. Crews barricaded Wilma at Fourth Street in the October storm and water reached front doors on the 600 block.

Doak Boulevard and the southern edge

A two-lane collector along the south boundary, with a landscaped median from Mohler Road to Vera Avenue and turn lanes through the industrial districts. At least three storm manholes were forced out of the roadway here in the October storm.

West Main Street and the South Jack Tone district

437 acres between West Main Street, the river, Robert Avenue and South Highland Road, with 266 acres of low density residential and 104 of commercial recreation, plus apartment groups along West Main. Shared resident parking here carries the visitor accessible spaces.

The 2000s subdivisions

Chesapeake Landing, Brookline Estates, Montecito Estates, Palm Grove Estates, Poppy Hill Estates, Seven Oaks and Cornerstone, built between 2003 and 2008. Their common areas and visitor bays are on their original surface and are now at the age for a first treatment.

Asphalt paving sub-services available in Ripon

Parking lot paving in Ripon for new yards and expansions in the North Pointe plan area off Jack Tone Road
Asphalt repair for digouts at South Stockton Avenue plant yards where wheel paths have failed
Pothole repair for winter hazards on the older streets south of Main, dug out when dry
Asphalt resurfacing for legacy industrial pavement near the river, replaced surface by surface
Sealcoating over a repaired 2000s common area, with irrigation off five business days first
Crack sealing for joints opening before the next two-hour downpour finds the base
Parking lot striping for travel plaza layouts and the accessible set at Jack Tone Road

Questions from Ripon property owners and managers

The City of Ripon Building Department at 259 North Wilma Avenue, which handles plan review, permits and inspections inside the city and takes applications through its online permit centre. Residential and light commercial plans are checked by City staff, while heavy commercial and industrial plans go out to professional plan check services, so an industrial yard's paperwork takes a different route. The contractor the request is handed to pulls the permit where one is needed.

Asphalt paving near Ripon

All property services in Ripon →
Request

Asphalt paving in Ripon

Service and city are pre-filled: choose the property type and timeframe and a crew is dispatched from Modesto with a time. Water coming in right now: shut the supply if you can reach it and call the emergency line.

Start a request
3xrank
Propertyvendr is owned, built and managed by 3xrank
Visit 3xrank.co →