Salida, Stanislaus County · 7 miles from the Modesto base · Planned work, scheduled with the property

Concrete flatwork in Salida, CA

Concrete flatwork for the Broadway Avenue commercial core, the school and district campuses on Stoddard and Toomes, the highway commercial ground at the Kiernan and Hammett interchanges and the industrial yards north of Pirrone Road: walks, ramps, landings, slabs and approaches.

DispatchEn route
Modesto base → Broadway Avenue
Site route · surveySite visit booked
ADA checklistCode
Walk slope≤ 1:20
Ramp run≤ 1:12
Curb ramp≥ 48 in
Flares≤ 1:10
Slopes and widths measured on site against CBC Chapter 11B

Why concrete flatwork is needed in Salida

Broadway is the one street in Salida where people park at the kerb and walk to a door. The County treats it as the community's commercial core, with a tree-lined landscaped median west of Curtis Street, a concrete median and parallel parking to the east, and an alley behind the lots. The 2010 ADA Standards ask for a route within the site from parking, public sidewalks and transit stops to the entrance they serve, and on a kerbside street that route is the crossing, the curb ramp and the panels in front of the shop.

Salida is unincorporated, so the frontage question is answered by the County and by state law. No ordinance particular to Salida sets out who grinds an offset or who pays when a street tree lifts a panel, and nothing here is assumed: Streets and Highways Code 5610 is the rule that holds statewide, putting the duty to keep a sidewalk from endangering people or property on the fronting owner, and anything beyond it is confirmed with the County for the parcel.

Half the community's frontages went in during one decade. Of 4,337 homes in the Salida CDP, 2,174 date from the 1990s and the median year built is 1993, with 94.8 percent single-family detached. Thirty years on, that is a very large number of walks, drive approaches and cul-de-sac returns reaching the age at which joints open and panels tip, and they reach it together rather than one street at a time, set against the asphalt paving that ages with them.

Two school campuses put the heaviest pedestrian load in Salida on a few hundred feet of concrete. Joseph Gregori High School stands at 5518 Stoddard Road and the Salida Union School District office at 4801 Sisk Road, with Vella Middle School at 5041 Toomes Road. A frontage walked in a crowd twice a day shows a lifted panel or a curb ramp missing its level top landing long before a quiet street does, and the replacement is phased around the bell rather than the traffic.

The heavy end of the work is the industrial ground, and it is the dustiest. Flory Industries on Toomes Road and BMC West Lumber on Murphy Road sit beside the Planned Industrial land of the North Gateway area, and the Kiernan interchange carries about 137,000 vehicles a day past the highway commercial frontage. Aprons and pads there are cut out under Title 8 section 1532.3: water at the blade, filtered collection on grinders and nothing swept dry.

Salida fact

The 2020 Census put 13,886 people in Salida, which LAFCO calls the largest unincorporated community in Stanislaus County. A community that size with no city of its own takes its frontage rules and its permits from the County, parcel by parcel.

Concrete flatwork, as delivered in Salida

Salida is 7 road miles from the Modesto base, north on Highway 99 to the Kiernan Avenue or Hammett Road interchange. The same marked plan carries the job from first measurement to handover.

1
Request and site visit

The request sets out the property and the route in question, and the assigned contractor comes to measure it. Site visit scheduled at a time that suits you. Start date set in the written estimate. Running and cross slopes, changes in level, ramp rise, landing sizes, curb ramp widths and detectable warnings are all written down.

2
Scope and permits

Salida is unincorporated, so the permit comes from the Stanislaus County Building Permits Division at 1010 10th Street in Modesto. Parts of the fire district south of Kiernan Avenue lie in the City of Modesto's sphere and two areas have been annexed, so the authority is confirmed for the parcel before anything is drawn.

3
Protect the public

Where the public uses the walk or the alley behind Broadway, barricading and lighting go up at the contractor's cost and a usable way round the work stays open.

4
Cut and remove under silica controls

Saw blades take water continuously, grinders run to a filtered collector, debris is kept wet, and a competent person checks the site.

5
Grade, form and set slopes

Forms are set from the measurements rather than from what was there: 1:12 on a ramp run, 1:20 along a walk, 1:48 across a landing or an accessible aisle, 1:10 on a flare. Detectable warning panels are placed to the curb face, not to the edge of the pour.

6
Pour, finish and cure for the weather

Below 40 degrees the pour is protected; in the dry heat of a Salida summer it is placed and cured against fast set and shrinkage cracking.

7
Verify and document

The finished slopes, widths, landings and edges are measured again, photographed and dated, and the record goes to the owner. County work in the right of way is left as the County requires it.

Where concrete flatwork is needed in Salida

Salida is a commercial core, two school campuses, a pair of freeway interchanges and a long industrial edge, each with its own flatwork.

Downtown Salida and Broadway Avenue

The County's commercial core, inside the former redevelopment area covered by the 1991 design guidelines, with a landscaped median west of Curtis Street and a concrete median and parallel parking east of it. A records search found three historic buildings in the town, and their entrances meet the walk directly.

Salida Boulevard

The fire district's only staffed station stands at 4820 Salida Boulevard, shared with the Sheriff's Office, and the Kiernan interchange rebuild included local road work here. An apparatus apron takes concentrated axle loads, so its joints and edges are surveyed apart from the walks beside it.

Kiernan Avenue (SR 219) interchange

The junction with Highway 99, rebuilt from 2015 with new ramps and a storm drain pump station, carrying about 137,000 vehicles a day on the freeway and 27,500 on Kiernan. Frontage work here has to keep a walkable route open while heavy turning traffic runs alongside it.

Hammett Road interchange and the northwest Amendment Area

Regional and highway commercial ground beside the interchange with two Business Park areas, where the freeway carries about 134,000 vehicles a day. Roads of six and up to ten lanes are planned into this corner, so a route built now is set out against the eventual kerb line.

Pirrone Road and the wastewater plant

The Salida Sanitary District plant at 6200 Pirrone Road, between the Stanislaus River and an MID canal, ringed by nine rapid infiltration basins and three percolation ponds. Walkways and equipment pads across a pond field sit on ground that stays damp, which is what moves a slab out of level.

Stanislaus River Park lands

About 244 acres along the river held in habitat and flood easements controlled by the Army Corps of Engineers, planned for a regional park the County does not expect within twenty years. Any path built here is a firm, stable surface question before it is a concrete one.

Stoddard Road and Sisk Road

Joseph Gregori High School at 5518 Stoddard Road and the Salida Union School District office at 4801 Sisk Road, with Sisk due to widen from a 50-foot to a 110-foot right of way. A widening moves the kerb line, so frontage work here is set out to the future line rather than the present one.

Toomes Road and Murphy Road

Flory Industries at 4737 Toomes Road, Vella Middle School at 5041 Toomes Road and BMC West Lumber at 4237 Murphy Road. A lumber yard runs forklifts and flatbeds across its aprons, and the slab edges at the gate go long before anything in the middle of the yard does.

North Gateway planned industrial lands

Planned Industrial ground east of Sisk Road inside the area bounded by Ladd Road, Dale Road, the Pelandale Expressway and Sisk Road. New buildings here start with an office entrance and visitor parking, so the accessible route is drawn before the truck court is.

Ciccarelli Road and Ladd Road

The unstaffed Salida Fire Station at 5551 Ciccarelli Road, rated in excellent condition, and the station at 1330 Ladd Road, rated poor and rented to a private business. A building let to a business opens its door to the public, which brings the route from parking with it.

The existing plan area and the Sanitary District

About 1,485 district acres with 4,038 residential and 238 commercial connections, covering most of what was built before 2007. Routine work here is domestic: drive approaches, front walks and the panels the district's own trenching has cut and reinstated.

South of Kiernan Avenue, in Modesto's sphere

Parts of the fire district south of Kiernan lie inside the City of Modesto's sphere of influence, and two areas were annexed to the City without leaving the district. The permitting office for a frontage here is confirmed parcel by parcel before the estimate is written.

Concrete flatwork sub-services available in Salida

Concrete slabs and patios in Salida for equipment and storage pads on the Planned Industrial ground east of Sisk Road
Sidewalk repair for lifted and cracked panels along the Broadway Avenue shopfronts and their alley
ADA ramps and curb ramps for crossings and curb ramps on the Stoddard and Toomes school frontages
Curb and gutter repair for broken curb and gutter where Sisk Road and Pirrone Road are widened
ADA path-of-travel compliance for the route from kerbside parking into the Broadway commercial core
Foundation repair for slab cracking in the 1990s housing that makes up half the community
Concrete driveways and approaches for drive approaches on the 1990s subdivisions inside the Sanitary District

Questions from Salida property owners and managers

The County. Salida is unincorporated, and the Stanislaus County Building Permits Division at 1010 10th Street in Modesto takes the application, with online filing through the County's portal for the project types it allows. On a tenant improvement it is the County that applies the path-of-travel rule as well. The contractor the request is handed to pulls the permit once the scope is agreed.

Concrete flatwork near Salida

All property services in Salida →
Request

Concrete flatwork in Salida

Service and city are pre-filled: choose the property type and timeframe and a crew is dispatched from Modesto with a time. Water coming in right now: shut the supply if you can reach it and call the emergency line.