In Gustine the diversion paperwork comes before the permit, not after the job. The City's Building Division processes permits for all construction inside the city limits, and its own rule is that every new construction, remodel and demolition submits a CalGreen waste management plan for 65 percent diversion before the permit is approved, unless an approved mixed construction and demolition facility is used. CalRecycle sets the same 65 percent minimum in CALGreen sections 4.408 and 5.408, and says a more stringent local rule applies instead where one exists.
Half this town's houses are older than the rules that govern taking them apart. Of 2,169 occupied homes, 1,111 have passed forty years: 169 from 1939 or earlier, 324 from the 1960s and 450 from the 1970s. Title 8 section 1529 presumes thermal system insulation and surfacing material in anything built by 1980, and asphalt or vinyl flooring laid by then, to contain asbestos until it is verified otherwise, and building owners determine what is present before work starts. Manual demolition of drywall where lead-containing paint is present is a presumed lead task.
A canal from 1878 turned Gustine into a dairy town, and the plants are still here. The Miller and Lux Canal brought irrigation water, alfalfa and the dairy industry, the city grew into the dairy centre of the West Side of Merced County, and many food and dairy processing plants remain, with industrial uses set near the eastern border away from homes. A plant alteration produces insulated panel, coated metal, pipework and slab cuts rather than drywall, and cutting a slab is silica work under section 1532.3.
The ground here is clay, it is wet, and both show up in the excavation. The General Plan records that the majority of the planning area's soils have a moderate to severe shrink-swell problem that limits the siting of dwellings, commercial buildings, streets and roads, and that most are rated only moderate for shallow excavation because they are too clayey and wet, with free water 5 to 20 feet below the surface. Wet clay spoil is heavy, it does not travel clean, and it is kept out of the concrete stream so the inert load can still be crushed for road base.
Storm water leaves Gustine by pump, and the plan says the pumps are not to be relied on. The City's storm drain system collects runoff and transfers it to the Central California Irrigation District, and the Revised Storm Drain Master Plan states that pumped discharge cannot be assumed to be non-interruptible because of a historical problem with pump failures and power disruptions. Material is not stockpiled where a stalled system would reach it, and Penal Code section 374.3 counts every day dumped rock, concrete, asphalt or dirt remains as a separate violation.
The City has no full-time building official and contracts independent staff for application review and plan check, so a permit takes two to six weeks after planning approval and a first plan review runs one to 24 working days. The waste management plan is part of that submission.
Gustine is 30 road miles from the Modesto base, down Highway 33 through Patterson and Newman or off Interstate 5. A downtown shopfront and a plant floor are recorded the same way: stream, weight, date, photograph.
The request names the Gustine address, the permit type and number, the age of the building, the streams expected and the access for a truck. Same day or within 1 to 2 days, depending on urgency and availability. From a single item to a full truckload, priced by volume in the written estimate. Morning or afternoon arrival windows, confirmed when the estimate is booked.
The City's Building Division at City Hall on Fifth Street processes the permit, with a CalGreen waste management plan submitted before approval on new construction, remodels and demolition. A demolition also needs the owner's survey of all suspect material and the air district's release, and ten working days run from notification either way.
The streams named in that plan are the streams kept on site: wood, metal, drywall and cardboard against concrete, asphalt, brick and clay spoil, with universal waste, treated wood and flammables in covered containers of their own.
Chutes or barricaded drop zones bring material down, work areas and stairs are cleared as the job runs, and cutting dust is wetted or drawn off instead of dry-swept.
Loads are covered before they reach Route 33 or Route 140. On a demolition water goes onto razed material and onto unpaved ground within a hundred feet of the structure, which on the annexation ground and the airport road is the whole working area.
Clean single streams go to a recycler that can verify them, and mixed debris to a permitted facility, with concrete and brick kept free of dirt and protruding rebar and within the size a county site takes.
Close-out is a weight ticket for every load, the stream list against destinations, the dates and the photographs, handed to the permit holder so the diversion side of the permit can be closed out.
Gustine is 1.6 square miles at a crossroads of two state routes, and its four quadrants each hold a different mix of building age and use.
The City is revitalising downtown while keeping its original character, evaluating architecture and shop facades, and has proposed street drainage gutters here. The General Plan names the condition of the older buildings and their extensive shake shingle roofs among its fire concerns, and a shake tear-off is a wood stream of its own.
Bounded by the city limits, West Avenue and South Avenue, this quadrant holds downtown and consists mainly of commercial and industrial zoning, with the city's largest areas zoned for higher density. Vacant sites of 0.83 and 1.01 acres on 5th and 6th Avenues are to be rezoned for 16 and 20 units.
North of South Avenue and west of West Avenue, mostly single-family, with newer and larger housing at its northern and western tip. The irrigation district canal borders the western edge of the city and is treated as a safety hazard with warning signs, so nothing is staged against it.
South of South Avenue and east of West Avenue, mostly single-family and public-institution zoning, with a vacant 6.21-acre site at Sullivan Road and Grove Avenue inventoried for 62 units. The 33-unit affordable development here turns over by unit renovation rather than by demolition.
South of South Avenue and west of West Avenue, mostly single-family and public-institution zoning, with a vacant 2.20-acre site on the highway to be rezoned from medium to high density for 44 units. Frontage work here loads directly onto a state route, so trips are booked rather than open-ended.
The General Plan found no adequate municipal drainage north of North Avenue, and the community ditch beside it was designed for irrigation, growing smaller to the east and carrying drainage only in the wet season. Spoil and pavement are removed the same day rather than left beside a ditch line.
The subdivision drains through the High School Ditch system on the north side of the city, which the storm drain plan judged a viable route for detained runoff. Tract housing of that generation is at reroof and alteration stage, and a tear-off separates into clean streams.
Route 140 carries 5,000 to 7,200 vehicles a day between Linden Avenue and Fourth Avenue. The City has listed a bike lane project, a median safety project at Schmidt Park and a roundabout at the junction as in design, and roadway work of that kind produces planings and base as inert material.
The noise study placed the cheese plant south of Route 33 between Second and Third Streets, with homes to the south and east, and most of the city's mobile homes outside its senior park stood near it along Highway 140. A plant alteration here works within a few hundred feet of housing.
A 42-inch storm drain follows the Meredith Avenue extension and a 24-inch line runs along Carnation Road, with a district pipeline parallel to Meredith. A September 2024 exemption notice proposed planing and repaving about 51,737 square feet of asphalt concrete on Railroad Avenue.
About 219.2 acres were proposed for annexation with prezoning, new roads and utilities, with the district's Main Canal listed as the waterway. Vesting tentative maps have been approved for three developments in the master plan area, though developers report difficulty finding builders.
The City-owned airport sits 1.5 miles east of town on about 45 acres, with a 3,200-foot runway and 14 City and 4 private hangars, and the wastewater plant is a 12-pond marsh system with a replacement planned before 2032. Hangar and plant work is a long haul back to the highway.
More than the state code asks on its own. The City's Building Division requires every new construction, remodel and demolition to submit a CalGreen waste management plan for 65 percent diversion before the permit is approved, unless an approved mixed construction and demolition facility is used. That plan sets out which streams the job expects, so the sorting on site is planned to match it, and the weight tickets afterwards are filed against the same list for the permit holder.
Clean single streams of metal or wood go to a recycler that can verify what it took. Mixed loads go to a permitted facility and the weight ticket comes back with the crew, filed against the Gustine address. Merced County landfills take separated concrete and brick that is clean, free of dirt and protruding rebar and no more than two feet in any direction, and separated uncontaminated sand, gravel, road base or asphalt. Pickup and trailer loads must be covered.
It is separated rather than mixed. Wood waste is by far the largest portion of the waste stream that construction and demolition activity generates, and a clean single stream of it can go to a vendor that recycles it, which is also what a diversion plan is built around. Anything treated with chemical preservatives against insects or fungal decay is managed as hazardous waste instead, so treated and untreated timber never share a container.
It changes the proportions and the handling. The General Plan records that most of the planning area's soils carry a moderate to severe shrink-swell problem and are rated only moderate for shallow excavation because they are too clayey and wet, with free water 5 to 20 feet down. Wet clay spoil is bulky and contaminates a concrete load, so it is kept as its own stream and the inert material stays clean enough to be crushed.
Yes. A demolition is distinguished by the removal of a load-bearing member of the structure, and all potentially asbestos-containing material in it is tested or surveyed for asbestos content. Regulated asbestos is abated before the demolition may commence, and the release reaches the municipality that issues the permit. Where there is none, the work still waits ten working days from the date of notification.
Universal waste, treated wood, asbestos-containing material and anything holding polychlorinated biphenyls each go as their own stream. Fluorescent tubes and lamps, batteries and mercury wastes are generally not allowed in solid waste landfills, and non-hazardous asbestos is generally not accepted at landfills across the state. Older caulk, paint, glues, plastics and lighting ballasts are named as PCB-containing materials, so they are identified at the walk, and any furniture, appliances or stock left in the building are set aside for junk removal in Gustine rather than the debris load.