Every service carries a Gustine page of its own, written from the City's own drainage, permitting and building years. Five answer at any hour; the rest are scheduled from the form.
Gustine is 1.6 square miles at the crossing of State Routes 33 and 140. It grew from a Southern Pacific station, took its first post office in 1907 and incorporated in 1915, and the canal that arrived in 1878 made it the dairy centre of the county's west side. Of 2,169 occupied homes, 1,111 have passed forty years, and 1,771 of the units are detached houses.
Rain falls from late October through early April, and the ditches change job when it does. The community ditch along North Avenue and the district pipeline along Meredith Avenue carry irrigation water in summer and drainage in the wet season, and the City's storm drain system passes its runoff to Central California Irrigation District, which serves more than 1,600 farms. Paving, roofing, stucco and exterior painting run in the dry months. The county plan rates heavy rain, dense fog and extreme heat as high significance here.
Flooding here comes from drainage rather than from a river. The General Plan puts the city outside the 100-year floodplain, and puts the flooding that does happen down to poorly developed surface drainage on flat ground, clay soils and a high water table, with free water five to twenty feet below the surface. Storm water leaves through two pipelines east of the city and three earth ditch systems to the north-east.
Wind and fire cover are the other two things to plan for. The county hazard plan records an 80 mph thunderstorm wind at Los Banos and Gustine on 1 April 1996, and funnel clouds over the city in April 2005 and January 2006. The volunteer and county fire service reaches any part of town in about four minutes.
Every Gustine service page handles these areas on their own, because drainage, zoning and building age differ across the four quarters of town.
The old core in the north-east quarter, where the City is checking architecture and shop facades as it revitalises the street.
Commercial and industrial zoning with the city's largest higher-density housing areas, and vacant sites on 5th and 6th Avenues.
Single-family blocks north of South Avenue, with the newest and largest houses at the northern and western tip.
Single-family and public-institution zoning, including a 33-unit development funded through rural rental housing loans.
Single-family and public-institution blocks west of West Avenue, with a 2.20-acre highway site set for rezoning.
The line north of which the General Plan found no adequate municipal drainage, beside a ditch built for irrigation.
A subdivision on the north side draining through a ditch system the storm plan judged a viable route for detained runoff.
Route 140 carries 5,000 to 7,200 vehicles a day between Linden and Fourth Avenues, with a roundabout listed as in design.
Homes standing south and east of the cheese plant, where an ammonia leak forced an evacuation in 1986.
A 42-inch storm drain follows Meredith's extension and a 24-inch line runs along Carnation Road, beside a district pipeline.
About 219 acres prezoned for new roads and utilities, where approved vesting maps are waiting on builders.
Beside Highway 140 east of town, the one part of the city on the edge of the 1 percent annual chance flood hazard.
The emergency trades work to the 120 to 140 minute window shown above, 24 hours a day, out of the Modesto base. The county's fog season runs from November through March and in some years into May, and the county plan lists delayed emergency response vehicles among its effects, so an arrival can sit at the far end of that window.
The City's Building Division processes permits for all construction inside city limits, including plan check and inspection, and the contractor assigned to the request pulls the permit. The City states two to six weeks after planning approval, with a first plan review of one to twenty-four working days. Every new build, remodel and demolition files a waste management plan aiming at 65 percent diversion.
Yes. An owner with a downtown storefront, a rental in the south-west quarter and a shed out toward the airport sends one request per property, and each keeps its own file, schedule and paperwork in the same client area. A loss that runs from drying into carpentry and painting stays on one file.
Water damage restoration, fire and smoke damage, mold containment, storm damage and board-up, and biohazard cleanup carry the emergency line. Junk and debris hauling, roofing, stucco, dry rot, structural repair, paving, concrete, grading, construction, remodelling and maintenance are requested through the form and scheduled. About 500 of the local fire service's yearly calls fall inside the city.
The county's 2021 hazard plan records Gustine as the only jurisdiction in Merced County outside the National Flood Insurance Program, sanctioned since 2 December 2009, and says the effective FEMA mapping shows no special flood hazard area inside the city apart from a small area near the airport. Check the position with your own insurer, and keep the dated photographs and moisture readings a claim needs.
