Finish work is where lead-safe practice bites hardest. 40 CFR 745.83 counts the removal of building components such as walls, ceilings, plumbing and windows as a renovation, and leaves out only minor repair and maintenance that disturbs six square feet or less of painted surface per room inside, or twenty square feet or less outside, with no window replacement, no demolition of painted surface areas and no prohibited practice.
The rule turns on the building's age and who uses it. The EPA programme covers paid work disturbing painted surfaces in homes, childcare facilities and preschools built before 1978. Target housing is housing built before 1978, other than housing for the elderly or people with disabilities and zero-bedroom dwellings, unless a child under six lives or is expected to live there.
California adds its own thresholds on top of the federal ones. Health and Safety Code 17920.10 makes disturbing lead-based paint without containment a lead hazard in a dwelling where the area reaches two square feet in any one interior room or space, twenty square feet on exterior surfaces, or ten percent of the surface area of a small component such as a window sill, a baseboard or trim. Cal/OSHA section 1532.1 covers the crew side of the same work.
Old flooring and its mastic leave before the new floor arrives. Asphalt and vinyl flooring installed no later than 1980 is treated as asbestos-containing until testing shows otherwise, so what comes up is handled and disposed of accordingly. What is taken out goes on the diversion route where the permit calls for it, which CalRecycle puts at 65 percent of construction and demolition debris.
The finish in every affected room is written down from the photographs taken before demolition: board thickness, texture pattern, paint sheen, floor covering, base profile and door and trim style. That list is what the estimate prices and what the walk-through at the end is checked against.
Where painted surfaces in a pre-1978 dwelling are disturbed beyond the minor repair limits, the area is contained, the work practices apply and cleaning verification closes it before the finishes go on.
Board is hung to the line the demolition record shows, taped, and finished to the level the surrounding wall carries, so a patched room reads as one surface.
The existing texture is matched on a sample area and approved before the room is sprayed, then primer and finish coats go on to the sheen recorded in the survey.
Underlayment, floor covering and base go down after the paint, with transitions set to the rooms the loss did not reach.
Doors, casing, trim and cabinet bases go back last, the rooms are cleaned, and the building is walked against the approved scope with the owner, manager or board.
A finish is matched on a sample before it is matched on a wall. Texture, sheen and floor profile are approved on one area first, because a room sprayed to the wrong pattern is a second demolition.
A unit is let again on the finish, so board, paint, flooring and base are the stage the schedule is measured against.
A suite opens on the finish too, and the work is sequenced around trading hours so the front of house is last to be closed.
Ceiling grid, board partitions and carpet tile are replaced in zones, with the route to the exits kept open throughout and the lighting put back as it was.
A build year before 1978 puts containment, work practices and cleaning verification around the same board, paint and trim work that a newer house would not need.
Corridors, lobbies and stairwells in a block are finished to what the association's records show, and the scope is presented to the board on its own lines.
Board, paint and floor covering in an office built inside a shell are replaced around racking and stock, so access sets the order of the rooms.
Sometimes, and the finish decides it. A small board repair in a flat-painted room disappears; a sprayed texture or a sheen that has aged rarely does, so the estimate says where the line falls. In a home built before 1978, the size of the disturbed area also decides which work practices apply.
Under the federal renovation rule it is work that disturbs six square feet or less of painted surface per room inside, or twenty square feet or less outside, with no window replacement, no demolition of painted surface areas and no prohibited practice. A loss rebuild usually goes past that, so the full work practices apply.
In the rooms being finished, yes, because the sheen and colour are recorded before demolition and matched on a sample area first. Where only part of a room is disturbed, the estimate says whether the wall is taken to the nearest corner or the whole room is recoated.
It is lifted, and where it was installed no later than 1980 it is treated as asbestos-containing until testing shows otherwise. What leaves the building is recorded, and where the permit calls for diversion it is ticketed against the 65 percent route.
Yes. Where the lead work practices applied, cleaning verification closes that part of the job and is recorded, as the documentation guide sets out. The rooms are then cleaned and the building is walked against the approved scope.
The drywall and finish rebuild is requested through the insurance restoration page for your city, which carries the local building stock and permit authority.