California's access rules name structural repairs alongside alterations and additions. Where they are made to an existing building, an accessible path of travel to the specific area of the work has to be provided, and that path reaches the primary entrance, the toilet and bathing facilities, the drinking fountains, the public telephones and the signs serving the area. The Division of the State Architect's advisory manual sets the section out in full.
What that costs is capped, and the cap moves every January. At or below the valuation threshold, which is $209,208 for 2026, the cost of complying with the path-of-travel requirement is limited to 20 percent of the adjusted construction cost of the alterations, structural repairs or additions. Above the threshold, an unreasonable-hardship finding still leaves 20 percent as the floor.
An existing building owes something whether or not it is being repaired. Under the Title III regulations a public accommodation removes architectural barriers where the removal is readily achievable, meaning easily accomplishable and able to be carried out without much difficulty or expense. The examples given include widening doors, installing accessible door hardware, installing grab bars in toilet stalls and rearranging toilet partitions. The priorities put access to the goods and services second and restrooms third, after getting through the door.
A CASp report turns all of that into a list with dates on it. Where a site needs correction, the report identifies and describes the structures or areas needing correction, the correction needed, and a schedule of completion for each within a reasonable timeframe, under Civil Code 55.53. The assigned contractor builds to the corrections in your CASp report.
The CASp report's list of corrections and its schedule of completion are set beside the structural scope, so that what the repair triggers and what the report already asked for are priced once. Items on the site route outside the building are separated out at this point.
The entrance serving the area worked on, the door leaf and its clear width, the threshold, and the hardware that has to be operable without tight grasping or twisting.
Grab bars at the water closet, partition layout and door swing, and the fixtures in the restroom that serves the area, rearranged rather than rebuilt where that does it.
Room and facility signs serving the area, mounted and finished so they can be read and touched, including the signs that direct someone to the accessible entrance or restroom.
The route inside the building from the entrance to the area worked on, including drinking fountains and public telephones serving it.
Every item is signed off against the line in the report it answers, with the date it was finished, and that record goes into the file beside the permit.
The rule is written about the area being worked on, not the whole building. What comes in with a structural repair is the route to that area and the facilities serving it, and that is where the cap is spent.
A public accommodation where the entrance door, its hardware and the restroom behind the dining room come in with any structural work in the tenancy.
Suites where the route from the entrance to the treated area, the restroom serving it and the room signs are the items a report usually lists.
Lobbies, corridors and shared restrooms on the floor being altered, where the door hardware and the partitions are the readily achievable items.
The office and restroom block inside a tilt-up, which is the public-facing part of a building whose structural work is usually at the walls and roof.
Clubhouses, mail rooms and leasing offices, where the entrance, the restroom and the signage are the items a board is usually asked about.
Lobby doors, public restrooms and the signs that get a guest to them, done with whatever structural work is running in the same part of the building.
Not every one, but the rule is written to catch them. Where an alteration, an addition or a structural repair is made to an existing building, an accessible path of travel to the area of the work is provided with it. What that reaches is the entrance, the restrooms, drinking fountains, telephones and signs serving the area.
It is a cap, not a target. At or below the valuation threshold published for the year, the cost of complying with the path-of-travel requirement is limited to 20 percent of the adjusted construction cost of the work. Above the threshold it goes further, and even an unreasonable-hardship finding leaves 20 percent standing.
The report does. A CASp inspection produces an identification and description of the areas needing correction, the correction needed, and a schedule of completion for each one. The assigned contractor builds to the corrections in your CASp report rather than forming a view of its own.
Because a commercial lease form executed on or after January 1, 2017 states whether or not the premises have undergone inspection by an access specialist under the state programme, under Civil Code 1938. Tenants ask, and the answer usually starts the conversation.
Those are the site route, and they sit on the path of travel page with the ramps, curb ramps and walks. The line is the building envelope: outside it is concrete work, inside it is this page.
Building-side access work is requested through the structural repair page for your city, which names the department that permits an alteration there.
