The association's own component list is the plan's first page. Civil Code 5550 has the board cause a visual inspection of the accessible areas of the major components it is obligated to repair, replace, restore or maintain at least once every three years, where their current replacement value is at least half the gross budget, and review the study each year. The study identifies the components with less than 30 years of remaining useful life, their remaining life and estimated cost, so the list of what to watch already exists.
What the association carries, and what an owner carries, is settled before a date goes on anything. Unless the declaration provides otherwise, Civil Code 4775 makes the association responsible for repairing, replacing and maintaining the common area, and leaves the separate interest with its owner. Gas, water and electrical service count as major components where the association is responsible for those lines, and the board commences the process of restoring an interrupted service that begins in the common area within 14 days.
The plan is the component list crossed with the calendar. Roofs on the common buildings take the spring and fall round, the common-area irrigation is checked before the frost nights and the private streets and parking are looked at in the dry months, while the items with their own statutory cycle, the backflow assemblies and any system in a building the association operates as a workplace, keep their own dates. Nothing on it is a new obligation: it is the association's existing list, sorted by when each entry is looked at.
Two dates reach the common areas from outside the declaration. Water Code 10608.14 prohibits potable water for irrigating nonfunctional turf on association and common interest development common areas from January 1, 2029, and owners certify compliance from June 30, 2031 where more than 5,000 square feet of common area is irrigated. Civil Code 5551 puts a condominium project's exterior elevated elements on a nine-year visual inspection, coordinated with the reserve study inspection; the balcony guide sets out which law reaches which building.
The reserve study is read first, and every major component on it is matched to something on the ground: roofs, private streets and parking, walkways, lighting, fencing, gates, pool-area structures, irrigation and the utility lines the association carries. Components the study is silent on are added to the list as found rather than assumed away.
The declaration and the plan are read against each item, so the plan holds only what the association is responsible for and says where a separate interest or an exclusive use area begins.
The statutory dates, the seasonal rounds and the reserve review are placed on a single calendar, so the board sees the year as one page.
Each round is walked by the trade it belongs to, and every finding is photographed at the component it came from and tied back to the line in the study.
Common-area repairs leave for commercial property maintenance, and elevated-element or structural findings leave for the trades that repair them.
What was looked at, what was found and what was done are written up against the component list, so the board's yearly review of the study starts from a dated record.
Boards change and managers change, and the component list outlasts both. Every entry on an association's plan therefore names the component as the reserve study names it, so the next board can read the record without having been in the room.
Roofs, corridors, stairs and entries the association maintains, with the separate interests behind them belonging to the owners.
Private streets, walkways, fencing and open space, where the recorded plan rather than the wall line decides what is on the list.
Turf, shrub beds and street frontage on shared irrigation, now carrying a statutory date of their own for the common areas.
Structures and hardware residents use daily and report quickly, which is why they are on the round rather than on a complaint.
Gas, water and electrical service in the common area, which are major components where the association is responsible for them.
Elevated elements inspected on their own nine-year cycle, whose reports feed the plan without being part of it.
The reserve study's three-year visual inspection and its annual review; the nine-year elevated-element inspection on a condominium project; January 1, 2029 for nonfunctional turf in the common areas; the annual backflow test on each assembly; and the seasonal rounds, which are set by the weather rather than by a statute.
No. The reserve study and the elevated-element inspection are separate exercises with their own timetables. The plan works from the component list they produce, holds their dates and puts the work that comes out of them on the calendar.
The components with the least remaining useful life on the study, then the items with fixed dates, then the seasonal ones: drains and roofs before the wet months, irrigation before the frost nights.
January 1, 2029 for the common areas of associations and common interest developments, and owners certify compliance from June 30, 2031 where more than 5,000 square feet of common area is irrigated. The water supplier enforces it.
The findings written up against the component list, with photographs and the trade each one went to.
An association's plan is requested through the preventive maintenance page for the city, which names the communities and the supplier whose dates apply.