The lot looked at while it is still in good condition: the surface and its cracks, the inlets and the way water leaves, the islands and their turf, on strip centers, tilt-up truck yards, apartment and HOA parking and business parks across 32 cities, with treatment timed rather than deferred.

Sample · one lot, pre-rain round
Lot · surface, inlets, islands3partspreventive maintenance, minor rehabilitation, routine maintenance
SurfaceWalked
InletsCleared
CracksLogged
IslandsTurf noted

Why a lot is watched early

A pavement program is built while the surface is still sound. Caltrans' Maintenance Technical Advisory Guide describes a pavement preservation program as three components, preventive maintenance, minor rehabilitation and some routine maintenance, and says an effective one addresses pavements while they are still in good condition and before the onset of serious damage. It is written for the state highway network, and it holds as a principle on a private lot.

Applying the right treatment to the right pavement at the right time is the core of pavement preservation. That sentence is the whole argument for looking at a lot on a calendar: the choice of treatment follows the condition the lot is in when it is looked at, and a lot nobody looks at is only ever seen at the point where a treatment no longer applies to it. Where pavement is not maintained effectively it eventually deteriorates to the point where reconstruction is the only choice left, and that is the costliest one.

The rain decides both halves of the year. The 1991 to 2020 normals for the Modesto airport station give April to October an inch of rain or less a month, against 1.07 to 2.57 inches a month from November to March. The dry half is when surface work can be done at all; the weeks before November are when the inlets, gutters and outfalls have to be clear, because a blocked inlet turns an aisle into standing water and standing water finds every open crack in it.

Turf in a parking lot is nonfunctional turf by definition. Water Code 10608.12 includes turf located within street rights-of-way and parking lots in that definition, which puts the islands on the same list as the rest of the irrigated area. Surveys, treatments and striping themselves belong to asphalt paving and sealcoating.

What parking lot maintenance includes

1
The lot and its drainage

The request is taken with the lot, the buildings it serves and the traffic on it. The round starts with where water goes: inlets, grates, gutters, valley lines and the outfall, because everything else on the surface follows the water.

2
The surface walked

The lot is walked when it is dry: cracking, raveling, edge break-up and any area that is soft under load are marked on a lot plan and photographed in place.

3
Inlets cleared before November

Grates and inlets are cleared of summer litter and leaf fall, and anything the clearing reveals, a broken grate or a collapsed line, is written down.

4
Standing water recorded

Where water stood after the last rain is recorded while the marks are still visible, since ponding is the sign that grade or drainage, rather than the surface, is the problem.

5
Islands and their turf

Island planting, overspray onto the asphalt and the turf statute's reach over lot islands are noted with the irrigation round.

6
Work timed to the dry months

Each finding leaves as a written scope for the paving trade, placed in the dry half of the year and around the trading hours of the tenants using the lot.

The rule

A lot is cheap to keep and expensive to rebuild, and the difference between the two is the date it was last looked at. The round exists to see the surface while a treatment still applies to it.

Where a lot fails first

Strip centers and retail pads

Parking fields with inlets under the landscape strip, where a summer of litter collects and the first November storm ponds the aisle nearest the tenants' doors.

Tilt-up warehouses and truck yards

The same wheel paths take loaded trailers every working day, so the yard breaks up long before the visitor parking beside it does.

Apartment parking

Residents park on the same stalls for years, and the damage shows at the drive aisles, the bin pad approach and the carport edges.

HOA private streets and parking

Private streets and parking the association maintains come back on the reserve list, so the round's record is what the board reads when the study is reviewed.

Offices and medical suites

Staff and visitor parking that is full on weekdays and empty at the weekend, which is when the round and any work can happen.

Pre-1970s properties

Lots that have been patched more than once, where the round records what has already been done before anything new is proposed.

Questions about parking lot maintenance

The dry half of the year. April to October averages an inch of rain or less a month at the Modesto airport station, against 1.07 to 2.57 inches a month from November to March, so surface work sits in the dry months and the clearing of inlets and gutters sits in the weeks before them.

Parking lot maintenance by city

Lot rounds are requested through the preventive maintenance page for the city, which names the stock and the seasons the calendar is built around.

All 32 cities →

Related preventive maintenance services

Request

Parking lot maintenance in any of 32 cities

Start the request with preventive maintenance pre-filled, and a licensed crew is assigned to walk the lot and its inlets. Site visit scheduled at a time that suits you. Start date set in the written estimate.

Start a request
3xrank
Propertyvendr is owned, built and managed by 3xrank
Visit 3xrank.co →